1: Activities are the set of elemental tasks that are the basis for ___________ the project.

A.   Budgeting

B.   Scheduling

C.   Controlling

D.   All of these

2: Bounded distribution is a distribution with __________ .

A.   Limiting values

B.   Proper value

C.   Both

D.   None of these

3: Composite estimate is an estimate gathered from a panel of experts, then averaged into a composite estimate.

A.   True

B.   False

4: Indicates the minimum possible duration of a task or project and the associated costs is known as:

A.   Deterministic

B.   Crash Point

C.   Delphi Method

D.   None of these

5: Delphi method is an estimation approach in which a panel of experts anonymously submit contributions and then assess the contributions as a whole is called ______________ .

A.   Deterministic

B.   Crash Point

C.   Delphi Method

D.   None of these

6: Deterministic means refer to an assumption that the values of a forecasted metric are known with complete certainty.

A.   True

B.   False

7: _____________ individual perceptions and beliefs that cause individuals to over- or underestimate forecasted values.

A.   Full-Time Equivalents

B.   Estimation bias

C.   Normal Point

D.   None of these

8: Full-Time Equivalents (FTEs) the amount of work effort associated with a full-time resource.

A.   True

B.   False

9: Any payment made as a result of completing a project before or after a stated due date is known as :

A.   Incentive Payment

B.   Normal Point

C.   Panel of Experts

D.   None of these

10: ________ is the cost and duration of a task when the direct resource costs are minimized.

A.   Incentive Payment

B.   Normal Point

C.   Panel of Experts

D.   None of these

11: Individuals who are managers and technical experts drawn from the relevant areas of the business brought together to come to a consensus on estimates

A.   Is called ___________.

B.   Incentive Payment

C.   Normal Point

D.   Panel of Experts

E.   None of these

12: Parametric is an estimation approach that identifies the causal factors that determine work content and builds a mathematical model relating which estimation factors:

A.   The independent variables

B.   The estimated work content

C.   The dependent variable

D.   ALL of these

13: Precedence relationships Constraints on the order in which tasks must be performed.

A.   True

B.   False

14: A standardized set of parameters for projects are called ___________ .

A.   Project Template

B.   Precedence Relationships

C.   Resource Costs

D.   Stochastic Process

15: Any expense directly associated with performing a specific task or activity; also known as direct costs is known as:

A.   Resource Costs

B.   Stochastic Process

C.   Time-Dependent Costs

D.   None of these

16: _____________ is a process whose behavior is described by some probability distribution.

A.   Resource Costs

B.   Stochastic Process

C.   Time-Dependent Costs

D.   None of these

A.   True

B.   False

18: A hierarchical description of the project work content that begins with the major deliverables and shows the work associated with the delivery of these end product(s)/service(s) subdivided into elemental work packages or tasks is called ___________.

A.   Work Breakdown Structure (WBS)

B.   Work Content

C.   Work Package

D.   None of these

19: Amount of work that must be performed to complete the task is known as:

A.   Work Breakdown Structure (WBS)

B.   Work Content

C.   Work Package

D.   None of these

20: A synonym for tasks or activities that represent the basic unit of work used to develop the project schedule is called Work Package.

A.   True

B.   False